During the late 1980s, as part of Refocusing, Rebalancing and Refining (R3), the Physical Plant developed the following guidelines with input from faculty committees.
Significant service reductions and eliminations have occurred in addressing the budget difficulties since 1980-81; however, all buildings and building systems continue to function. Admittedly, several buildings are in poor condition, and those built in the 60s have major components nearing the end of their predicted life.